Showing posts with label Chris Wells Step up. Show all posts
Showing posts with label Chris Wells Step up. Show all posts

Friday, January 15, 2010

Chris Wells Poly Step Up Replacement






Switched to a PU/PE construction this time. The last EPS w/ PVS stringer didn't fair too long with the all time swells we've been enjoying this winter. Oh well, I guess better ridden to death than on Craiglist.